Business Friendly Development Abounds in Ardmore

Main Photo For Ardmore Industrial Airpark

Ardmore Industrial Airpark

620 General Dr. Ste 1 Ardmore OK 73401 US

Acres: 1,235 - 1,006.50

Media

ardmore industrial park building

Info

The Ardmore Industrial Airpark, formerly an Army Air Force Base, is situated 16 miles NE of Ardmore. From Interstate 35, take State Highway 53E, a super-wide improved two lane, 9 miles directly into the Airpark. The Airpark is also accessible from Ardmore utilizing the four-lane Highway 77N to Highway 53E.

The airstrip has two runways with landing lights. The longest runway is 9,000 feet x 150 feet (plus a 500 ft. overrun) with a shorter runway measuring 5,400 feet x 100 feet. The airport features full instrumentation including: glide-scope, adequate flight space for flight testing, FAA control tower, parking capacity for 100 commercial-sized aircraft, airplane wash rack and sewer facilities, fueling and defueling station, 24/7 fire, rescue and security; and two FBO’s.

A rail spur from the BNSF main line serves the Ardmore Industrial Airpark.

Current Tenant Information

CURRENT AVIATION TENANTS

  • King Aerospace Commercial Corporation (Part 145 Repair Station, Avionics, Paint and Aircraft Maintenance.)
  • The Line Shack (Fixed Base Operator, Government Fuel Sales)
  • ATS World Wide- Aviation Research and Development

CURRENT NON-AVIATION TENANTS

  • Dollar General Corporation Distribution Center
  • EJ Foundry Ardmore
  • Online Packaging
  • Carbonyx

AmeriPointe North American Logistics Park

The newly constructed AmeriPointe rail loop will accommodate over 150 fully loaded cars, with a transload station that can handle all cargo, whether liquid or dry, and the ability to transfer to pipelines, trucks, or onsite storage facilities. Developmental land includes 800+ acres adjacent to the rail loop for industrial development. Land contours of the entire area require minimal grading leaving it optimized for construction. Learn more about the AmeriPointe- North American Logisitics Hub

Category: Featured Posted On: 01-22-2026 Last Updated: 1 month ago


Featured, Utilities, Transportation, Financials, Primary Contact, Materials

Features

Expandable

Land

Industrial Park

Phase 1 Environmental Audit Complete

In City Limits

Building

Sub-dividable

Build To Suit

Shovel-Ready

Business Park

100-Year Flood Plain

Utilities

Water

Sewer

Electric

Natural Gas

High Speed Telecom

Transportation

Rail Access To Site: Yes

Nearest Highway: 9 miles

Financials

Acres: 1,235 - 1,006.50

Primary Contact

Dan Luttrell
VP of Industrial Assets 
(580) 389-5238